This types of scaffolding is not using in the construction industry ,very commonly, now a days. Need to fix the “braces” diagonally across “standards”. If the scaffolding is tall, we fix braces as additional support and for stability of scaffolding. “Putlogs” connect the scaffolding to the wall through the hole made in the wall, at an intervals of between 1.2 and 1.5 meters. Using the “ledgers”, we connect the “standards” at a vertical intervals of about 1.2 to 1.5 meters. The distance between standards are about 2 to 2.5 meters. The placing of “standards” or “verticals” is at a distance of about 1.2 meters from the wall. But, now a days, we use steel pipe as “standard”. In the olden days, these standards made of timber or bamboo were in use. The name of vertical membrane is “standard” and horizontal membrane is “legder”.We have to fix the vertical members firmly into the ground, parallel to the wall under construction. ![]() Single scaffolding is often preferable in brick masonry works. ![]() So, we need to construct Single scaffolding using standard, ledgers, putlogs. This type of scaffolding consists of a single framework of standards, ledgers and putlogs connected together. Single Scaffolding- Type of scaffolding Single scaffolding or Brick Layer Scaffolding
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |